Testimonials

"The diagnostic solution from Festo showed me the deviation at 9.00 am on a Friday morning. The clamping device in one of my machine tools was in the process to fail. Based on this information I changed the clamping device between the next change of shifts. At the beginning of the second shift the machine was up and running without any production loss. It saved me a crash with 2 days of downtime, repair costs, and production loss and repair parts and labor."

 

Bill Bilbaro, Davis Vision, New York
January 5, 2007