The purpose of this post is to provide a workflow and instructions needed to commission CPX-FB34/44 with Siemens, S7-1200 Series Modular PLC. This document applies to TIA Portal V16 Update 4. These instructions include manual configuration of Siemens and Festo hardware components.
Preparation: Modular PLCs -S7-1200 Hardware Configuration
This post is provided solely for the purpose of offering setup assistance and general guidance. It is important to note that the ultimate responsibility for ensuring the overall safety and proper functionality of the machine lies with the System Integrator / End User. It is crucial to exercise caution, adhere to proper safety protocols, and consult relevant experts or professionals when necessary.
Although Festo employees will be contributing to this blog, please note this is not the official Festo support channel. For more timely technical support please reach out to your regional Festo support channel and/or consult user manuals and relevant documentation.