Settingnewstandards:
TheserviceunitMS9-SV-C combines the
build-upof compressedairwithexhaust inone component.
Reliableandprecise control:
Oneofmanyvalve terminalsCPX
ensuresseamlessprocesses.
enoughof thisefficient energysource
available for the complex system inevery
loadsituation requiresadelicatebalance
between control andmaintenance. Large
partsof thesystemarecontrolledbyFesto
valve terminalsCPXwithwide ranging
specifications. TwoserviceunitsMS9-SV-C
ensure that the compressedair quality
remains constant. The term“serviceunit”
onlypartlydescribeswhat theMS9-SV-C
can reallydo.Of course it hasall the
compressedair preparation functions–
includingpressure regulators, on-off and
soft-start valves, filters, dryers, sensors
and lubricators–which canbe combined
tosuit theapplication.However,what
sets theMS9-SV-Capart fromother service
units is the combinationof apressure
buildup functionwithanon-off and
exhaust valveso that devices canbe fully
exhaustedand there isno residual
pressure.Having two functions inasingle
housingnot onlysavesspace, but also
ensuresgreater operator safetyduring
commissioningandmaintenanceand
protects central pneumatic components,
axesandshockabsorbers. In thenew
system fromStiwa, 4bar isfirst built up
STIWAHolding
GmbH
Salzburger Straße52
4800Attnang-Puchheim
Austria
Areaof business:
High-performanceautomation,
product andsoftwaredevelopment
formanufacturingautomation
and thenswitched through foraworking
pressureof 5.3 to7bar as compressedair
is required.
Increasedflow rate
Stiwauses twoserviceunitsMS9-SV-C in
itsnewsystem, as it requiresa lot of
compressedair duringstart-up. The large
nominal flow rateof up to16,000 l/min
means that the companymayevenbe
able tosaveonaserviceunit for smaller
machines.
Newstandardset
Stiwawas thepilot partner of Festo for
field testing theMS9-SV-C. Thehigh-tech
Austrian company isa leader in the
development of innovativeautomation
systems. TheMS9-SV-Cwasfine tuned
during intensivefinal testsandgivenan
earlyentry intoproduction–evenbefore
itsofficialmarket launch. It is thuswell
prepared for theworldof industrial
production,where it candeliver greater
securityandperformanceaswell as
reducedcosts. TheAustrianmachine
buildersnowuse theMS9andMS9-SV-C
asstandard.
“With theMS9-SV-Cwehave
aserviceunit that suitsour
demandingsystemsperfectly.”
StefanBaier,Headof ProductManagement Electrical EngineeringandPneumatics, Stiwa
is
infoservice
26-06
Reliableprocesses thanks toperfect
compressedair preparation